How to calculate concrete for a slab

Measure the rectangular slab’s length and width in feet, and its planned thickness in inches. Multiply the area in square feet by thickness in feet to get cubic feet. Divide by 27 to convert cubic feet to cubic yards. Choose any additional allowance before estimating an order.

Cubic feet = length (ft) × width (ft) × thickness (in) ÷ 12.
Cubic yards = cubic feet ÷ 27.

WORKED EXAMPLEA 10 × 10 ft slab, 4 in thick

100 sq ft × 4 ÷ 12 = 33.33 cu ft, or about 1.23 cu yd. With a 10% example allowance, the estimate is 36.67 cu ft, or 1.36 cu yd. At 0.60 cu ft of mixed yield per bag, divide 36.67 by 0.60 and round up: 62 bags. The 10% is an arithmetic example, not a required allowance.

Ready-mix or bags?

A ready-mix supplier will generally quote concrete by volume; share the calculated cubic yards and ask about minimum orders, delivery, waste and any short-load charges. For bagged mix, divide the volume including your chosen allowance by the mixed yield printed for that product, and round up. These are alternatives, not quantities to add together.

Bag yields depend on the product

The calculator’s presets are approximate mixed yields for QUIKRETE Concrete Mix No. 1101, based on its manufacturer data sheet. Different mixes with the same bag weight may yield different volumes; choose a custom yield if the product you buy differs.

Swipe to see all columns.

QUIKRETE 1101 mixed yield
Bag sizeYield per bag
40 lb0.30 cu ft
50 lb0.375 cu ft
60 lb0.45 cu ft
80 lb0.60 cu ft

Frequently asked questions

How many bags for a 10 × 10 ft slab?

At 4 inches thick, before allowance, it takes approximately 56 bags with a mixed yield of 0.60 cu ft each. The number changes with thickness, allowance and the actual product yield.

How much area does one cubic yard cover?

At a uniform thickness of 4 inches, one cubic yard covers 81 sq ft before allowance. Use our area and volume converter to calculate coverage at another depth.

Does the calculator choose a slab thickness?

No. Thickness, reinforcement, subgrade and mix selection depend on the project and local requirements. Confirm them with a qualified installer or supplier before ordering.